by Georgi | Mar 2, 2025 | Alfa Romeo Group A center lock hub
Alfa Romeo Group A center lock hub part 2 – Safety pin, Nut, Drive pins This is the second part of the project, where I am showing you how three more parts are crated. First is the locking nut. It is one of the most important components here, it is used to mount...
by Georgi | Mar 1, 2025 | Alfa Romeo Group A center lock hub
Alfa Romeo Group A center lock part 1 – Hub Crating CAD model of a wheel hub, that is using single large center nut to secure the wheel to the hub. This is commonly used on race cars for simplicity and weight saving. This is direct replacement for the original...
by Georgi | May 28, 2024 | Lada inline six cylinder engine.
The crankshaft The crankshaft will be assembled from several parts. This is prototype crankshaft, so I am not that concern about strength. I will statically balance the crankshaft, on the picture the counter weights a missing, they will be probably mechanically...
by Georgi | May 28, 2024 | Lada inline six cylinder engine.
The cylinder hear and camshaft The cylinder head will be cut the same way as the block. This means that it will be cut through the middle of the combustion camber and through the spark plug hole. The last will be a bit tricky to weld, but it seems possible. The...
by Georgi | May 28, 2024 | Lada inline six cylinder engine.
The cylinder block Everything will start with two stock Lada 2105 block. The one that will be the front section of the new engine will be cut through cylinder number 3. The rest of the new six cylinder engine block will be completed by a section of the second engine...